Freeport-McMoRan Inc. (FCX)
NYSE · Phoenix, Arizona, USA · Founded 1912 · CEO Kathleen Quirk
Valuation summary
$41.65 fair value versus $49.12 in the market, a difference of -15.2%. Rated Reduce.
| Fair value per share | $41.65 |
| Current share price | $49.12 |
| Upside / downside | -15.2% |
| Bear case | $28.49 |
| Bull case | $59.81 |
| Discount rate (WACC) | 10.4% |
| Terminal growth | 2.40% |
| Market capitalisation | $69B |
| EV / Sales | 3.0x |
About Freeport-McMoRan Inc.
Traces to 1912 as Freeport Sulphur. Kathleen Quirk became CEO in 2024. Freeport is one of the largest publicly traded copper producers in the world, with major operations in Indonesia at the Grasberg mine — one of the largest copper and gold deposits ever found — plus assets in Arizona and South America. Copper is the metal most directly leveraged to electrification: grids, electric vehicles and data centres all require enormous quantities.
Investment case
- Copper demand is structurally supported by electrification, grid investment and data centre construction.
- New copper supply is scarce — permitting and building a mine takes well over a decade.
- Grasberg is a genuinely world-class, low-cost orebody.
Key risks
- Earnings are driven by the copper price, which is cyclical and outside management control.
- Substantial Indonesian operations carry political, permitting and resource nationalism risk, and Grasberg is still recovering from the September 2025 mud rush, with mill throughput at about 67% of pre-incident rates in the third quarter of 2026.
- Mining is capital-intensive with significant environmental and closure liabilities.
Recent developments
- 2026-10-27 · Q3 copper production of 830m lb as the Grasberg recovery advances; earnings up sharply on higher copper and gold prices source
- 2026-10-02 · Q3 2026 copper output about 830 m lb, in line; Grasberg mill at about 67% of pre-incident rates; unit costs about 5% above $2.00/lb estimate source
- 2026-10-02 · Freeport reiterated Grasberg reaching 80% of capacity by mid-2027 and near full capacity by end-2027; Eastern Java smelter restarted late August 2026 source
- 2026-10-02 · Average realised copper price for Q3 expected above $6.50 per pound; Q3 results due 27 October 2026 source
Revenue by segment
| Copper | 74% |
| Gold | 17% |
| Molybdenum & Other | 9% |
Five-year forecast
| Revenue | Free cash flow | |
|---|---|---|
| Year 1 | $25.1B | $5.5B |
| Year 2 | $25.3B | $5.4B |
| Year 3 | $25.6B | $5.3B |
| Year 4 | $26.0B | $5.3B |
| Year 5 | $26.5B | $5.3B |
What the street says
The structural copper deficit argument is widely accepted, and realised copper prices above $6.50 per pound in the third quarter of 2026 are supporting earnings. The debate is now the pace of the Grasberg recovery, which management still expects to reach 80% of capacity by mid-2027, alongside Indonesian political risk.
Comparable companies: CCJ · SLB · VLO · LIN · APD · SHW · VALE · CRH
Open the interactive model, price chart and sensitivity grid →